Construction of a new 1.5ml tank of glass fused to steel

The Opus team designed this reservoir to be used in conjunction with existing reservoirs and another similar reservoir being constructed at the same time.

The Zone 138 Reservoir was constructed in the District of Hope. It is in mountainous terrain southeast of the downtown Hope business district.

These upgrades will eliminate the existing open reservoir, a source of potential contamination, and will increase pressures and fire flows to the district’s hospital.

Jakes Contracting undertook the site works. Stanco Projects supplied and installed the reservoir.